Curing is also called curing, is to have a good composite film into the drying room (curing room), so that the main agent of polyurethane adhesive, curing agent and cross-linked composite substrate surface interaction process. 
Text label: 
Curing is 
also called curing, is to have a good composite film into the drying 
room (curing room), so that the main agent of polyurethane adhesive, 
curing agent and cross-linked composite substrate surface interaction 
process. The main purpose of the aging of the dust-free 
workshop is to make the main agent and curing agent for a certain period
 of time to fully respond to achieve the best composite strength; 
followed by the removal of low boiling point residual solvent, such as 
ethyl acetate.
     1) The higher the curing 
temperature, the more favorable to ensure the composite strength, 
shorten the curing time, but may lead to film shrinkage deformation, 
smoothness deterioration, while energy consumption increased.
     2)
 The longer the curing time is, it is beneficial to ensure the full 
curing of the glue, but too long curing time is unfavorable to the 
production, because it increases the risk of waiting time, prolongs the 
delivery time, takes up more Working capital, increased energy consumption and so on.
     Therefore,
 the clean room should be considered a comprehensive balance of aging, 
through the experiment to find each product the best curing temperature 
and time to improve the process, reduce the curing temperature, reduce 
the aging time has great economic significance.
[Analysis and focus]:
Analysis points one:
As
 the density of air in the dust-free workshop changes with the 
temperature of the air, it greatly affects the air flow direction. 40 ℃ below the air flow direction, can choose to send the next back; 
40 ℃ above, should be used to send the level of horizontal or back to 
the next way back.
Focus: on the next delivery, prone to air temperature is different, 
the formation of the temperature layer is not the same, resulting in 
temperature, so that aging products are not uniform.
Analysis points two:
Excessive outlet temperature, filter and lamp variants.
Focus: If the high temperature of the curing room need to pay 
attention to the installation of the outlet and lamps must be used high 
temperature materials.
Analysis points three:
Large temperature difference between the area, the door must have enough insulation layer. Must be tight.
Focus: the door to heat insulation effect, to prevent the temperature string.
Analysis points four:
Air conditioning equipment configuration
Focus: air conditioning motor due to high temperature gas in the cycle, need to set the external motor.
Analysis points five:
Heat source selection, can choose hot water, hot oil and electric heating.
Focus:
 hot water for 40 ℃ below the curing room; hot oil and electric heating 
for 40 ℃, but the temperature is too high, need to do double overheating